Phased Construction
Phased Construction
Grading
A permit is not required for preparation of a site within private property limits.
Foundation
Building plans must include:
Foundation plan
Foundation cross section and details
Calculations are required to substantiate loads on the foundation system
Site plan requirements are identical to full submittal requirements except a landscaping plan is not required
Submit one complete site plan, including storm drain calculations
A foundation waiver is required prior to permit issuance
Shell or Complete Building
Site plan requirements are identical to full submittal requirements and must include landscaping plans
Submit one complete site plan, including drainage calculations, even if plans were previously submitted
Provide one complete building plan, including previously submitted foundation drawings
The City of Billings has a separate
handout
for commercial submittal requirements
Residential Phased Construction
The Building Division does not accept phased construction for residential applications
The one exception is the pouring of a monolithic slab (flat concrete) for a future garage
Adopted Codes
Construction Time Ordinance
Design Criteria
Fences & Retaining Walls
Floodplain Application Instructions
Outside City Limits
Phased Construction
Radio Frequency Unit
Employment
Agendas & Minutes
Online Payments
Watch Meetings Online
Transportation
Traffic Advisory
Volunteers
Warrants
Notifications
Parks & Recreation
Administrator’s Report
Report a Concern
Next
Previous
Government Websites by
CivicPlus®
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow